Tel: 01254 700222 - machining@wecl.co.uk

Follow Us on Twitter Find us on FaceBook

WEC Group News

Steel masters bridge the gap.
04 April 2008

A 75 tonne piece of Darwen has been unveiled as the centrepiece of a £200 million regeneration scheme in Bristol. Made completely from stainless steel, the unique £1.8 million, 200ft bridge links the city's Temple Quay harbour with the city centre.

The bridge is made of stainless steel and there has neven been anything like it before. It is also beautiful to look at. It is very elaborate with thousands of tiny holes with lights shining through. m-tec has never built a bridge before and now it is in place, we have had enquiries for the 2012 Olympic Games.
Tom Elliot - General Manager, m-tec

Specialist architectural metalworking company m-tec, a division of WEC Group, was chosen to fabricate the structure, because of its expertise in working with the material. A team of 25 fabricators and eight designers worked on the project for eight months. It was built in eight sections, shipped to Bristol and then constructed and welded into position.

m-tec, architectural metalwork

Description Initial artist's impression.


Lifting the bridge into place in August involved one of the largest cranes in Europe. With the bridge at its centrepoint over the water and suspended by the crane, the weight was approximately 1,500 tonnes.



Visit m-tec website
Copyright WEC Machining Ltd © 2018. All Rights Reserved. Registered Office: Britannia House, Junction Street, Darwen, Lancashire, BB3 2RB
Reg. in England No. 00353015 I VAT Reg. 326 0237 89
www.wec-group.com
Back to page top